Skip to the content.

AITIR 2.0 Controlled Pilot Evaluation Protocol

Version: 2.0.0 Status: Planning template; local approval required

Purpose

This protocol tests whether an implementation is useful, calibrated, bounded, governable, and resilient enough to progress through controlled stages. It does not authorize collection, monitoring, or automated response.

Required approvals before data access

Document purpose, lawful basis, minimization, retention, access, participant/workforce notice where required, contestability, and secure termination.

Prespecified questions

  1. Are source records complete, timely, correctly normalized, and provenance linked?
  2. Does identity resolution preserve uncertainty and avoid material false joins?
  3. Does detection performance hold on a chronological target-environment test?
  4. Are probabilities calibrated, and does calibration decay over time or subgroup?
  5. Does abstention concentrate errors at a review burden the organization can handle?
  6. Are policy decisions traceable to evidence, version, authority, and reason codes?
  7. Do stateful guards prevent stale, unauthorized, overbroad, or unsafe actions?
  8. Are actions idempotent, evidence preserving, reversible, and continuity aware?
  9. Does the system fail safely under source, model, policy, network, and connector loss?
  10. Can independent reviewers reproduce every material claim?

Progression stages

Stage Mode State-changing action Minimum evidence
P0 architecture and policy review none threat model, contracts, authority, privacy, continuity
P1 offline historical replay none provenance, chronological protocol, leakage tests
P2 live shadow monitoring none source health, latency, queue simulation, privacy controls
P3 advisory recommendations human executes outside AITIR analyst agreement, burden, explanations, override reasons
P4 narrow T0/T1 preapproved low-impact automation guard tests, accessible fallback, rate limit, expiration
P5 restricted T2 consideration only explicitly authorized deterministic conditions independent assessment, rollback, fault injection, mission approval

T3 remains human authorized. Progression is not automatic and may be reversed.

Data and split design

Metrics

Detection

ROC AUC may be reported but not used alone under rare-event imbalance.

Calibration and selective decisioning

Safety and authority

Robustness and security

Privacy, fairness, and human factors

Exit criteria

Thresholds are approved before the final holdout. At minimum:

Exact performance thresholds are local risk decisions and must not be copied from the 12-row example.

Reporting

Publish or retain, as authorized: